Factory Inspection of Oil Casing Pipe: Defect Treatment
how to identify defects in oil Casing Pipe During Factory inspection During factory inspection of oil casing pipe, it is important to identify any defects that may be present. the following steps should be taken to ensure that any defects are identified and addressed: Oil Tube chinese high–grade wholesaler,casing pipe china good Company, 1. Visual…
how to identify defects in oil Casing Pipe During Factory inspection
During factory inspection of oil casing pipe, it is important to identify any defects that may be present. the following steps should be taken to ensure that any defects are identified and addressed:
Oil Tube chinese high–grade wholesaler,casing pipe china good Company,
1. Visual Inspection: A visual inspection should be conducted to identify any visible defects in the oil casing pipe. This includes checking for any dents, scratches, or other surface damage.
Calculated mass c | |||||||||||
Nominal linear Mass T& C b,c | Wall Thick- ness | em, Mass Gain or Loss Due to End finishing d | |||||||||
Labels a | Outside diameter | inside Diameter | Drift Diameter | Plain- end | kg | ||||||
round Thread | Buttress Thread | ||||||||||
wpe | |||||||||||
D | kg/m | t | D | mm | kg/m | Short | Long | RC | SCC | ||
mm | mm | mm | |||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
7 | 17 | 177.8 | 25.6 | 5.87 | 166.06 | 162.88 | 24.89 | 7.61 | — | — | — |
7 | 20 | 177.8 | 29.91 | 6.91 | 163.98 | 160.8 | 29.12 | 6.74 | — 7.94 | — 8.28 | — 0.58 |
7 | 23 | 177.8 | 34.67 | 8.05 | 161.7 | 158.75 e 158.52 156.24 153.90 | 33.7 | 6.26 | 7.94 | 8.28 | 0.58 |
7 | 23 | 177.8 | 34.67 | 8.05 | 161.7 | 152.40 e | 33.7 | 6.26 | 7.37 | 7.65 | –0.54 |
7 | 26 | 177.8 | 39.14 | 9.19 | 159.42 | 151.6 | 38.21 | 5.79 | 6.79 | 7.13 | –0.69 |
7 | 29 | 177.8 | 43.6 | 10.36 | 157.08 | 149.32 | 42.78 | — | 6.23 | 6.4 | –1.31 |
7 | 32 | 177.8 | 47.92 | 11.51 | 154.78 | 147.18 | 47.2 | — | 6.23 | 6.4 | –1.31 |
7 | 32 | 177.8 | 47.92 | 11.51 | 154.78 | 142.86 | 47.2 | — | 5.68 | 5.79 | –1.91 |
7 | 35 | 177.8 | 52.09 | 12.65 | 152.5 | 139.72 | 51.52 | — | 5.18 | 5.24 | –2.47 |
7 | 38 | 177.8 | 56.1 | 13.72 | 150.36 | 136.52 | 55.52 | — | — | — | — |
7 | 42.7 | 177.8 | 63.84 | 15.88 | 146.04 | 133.38 | 63.41 | — | — | — | — |
7 | 46.4 | 177.8 | 69.35 | 17.45 | 142.9 | 130.18 | 69.01 | — | — | — | — |
7 | 50.1 | 177.8 | 74.85 | 19.05 | 139.7 | 74.58 | — | — | — | — | |
7 | 53.6 | 177.8 | 80.21 | 20.62 | 136.56 | 79.93 | — | — | — | — | |
7 | 57.1 | 177.8 | 85.42 | 22.22 | 133.36 | 85.25 | — | ||||
7 5/8 | 24 | 193.68 | 35.72 | 7.62 | 178.44 | 175.26 | 34.96 | 7.11 | — 8.58 | — 9.12 | — 2.59 |
7 5/8 | 26.4 | 193.68 | 39.29 | 8.33 | 177.02 | 173.84 | 38.08 | 6.78 | 7.91 | 8.38 | 1.84 |
7 5/8 | 29.7 | 193.68 | 44.2 | 9.52 | 174.64 | 171.46 | 43.24 | — | 7.13 | 7.51 | 0.98 |
7 5/8 | 33.7 | 193.68 | 50.15 | 10.92 | 171.84 | 168.66 | 49.22 | — | 6.16 | 6.44 | – 0.10 |
7 5/8 | 39 | 193.68 | 58.04 | 12.7 | 168.28 | 165.1 | 56.68 | — | 5.32 | 5.5 | –1.03 |
7 5/8 | 42.8 | 193.68 | 63.69 | 14.27 | 165.14 | 161.96 | 63.14 | — | 4.87 | 5.01 | –1.52 |
7 5/8 | 45.3 | 193.68 | 67.41 | 15.11 | 163.46 | 160.28 | 66.54 | — | 4.48 | 4.57 | –1.96 |
7 5/8 | 47.1 | 193.68 | 70.09 | 15.88 | 161.92 | 158.74 | 69.63 | — | — | — | — |
7 5/8 | 51.2 | 193.68 | 76.19 | 17.45 | 158.78 | 155.6 | 75.84 | — | — | — | — |
7 5/8 | 55.3 | 193.68 | 82.3 | 19.05 | 155.58 | 152.4 | 82.04 | — | |||
7 3/4 | 46.1 | 196.85 | 68.6 | 15.11 | 166.63 | 165.10 e | 67.72 | — | — | — | — |
7 3/4 | 46.1 | 196.85 | 68.6 | 15.11 | 166.63 | 163.45 | 67.72 | — | — | — | — |
2. pressure testing: Pressure testing should be conducted to ensure that the oil casing pipe is able to withstand the pressure of the oil it will be transporting. Any leaks or other defects should be identified and addressed.
3. ultrasonic Testing: Ultrasonic testing should be conducted to identify any internal defects in the oil casing pipe. This includes checking for any cracks, voids, or other structural defects.
4. Magnetic Particle Testing: Magnetic particle testing should be conducted to identify any surface defects in the oil casing pipe. This includes checking for any cracks, pits, or other surface damage.
By following these steps, any defects in the oil casing pipe can be identified and addressed during factory inspection. This will ensure that the oil casing pipe is safe and reliable for use.