Upset Tubing With Casing Pipe
The Benefits of upset tubing With Casing Pipe: How It Can Improve Your oil and gas operations Upset tubing with casing pipe is a cost-effective and efficient way to improve oil and gas operations. This method of pipe installation offers a number of benefits that can help to reduce costs and improve safety. First, upset…
The Benefits of upset tubing With Casing Pipe: How It Can Improve Your oil and gas operations
Upset tubing with casing pipe is a cost-effective and efficient way to improve oil and gas operations. This method of pipe installation offers a number of benefits that can help to reduce costs and improve safety.
First, upset tubing with casing pipe is more reliable than traditional methods of pipe installation. The process involves welding the casing pipe to the upset tubing, which creates a stronger bond than traditional methods. This stronger bond helps to reduce the risk of leaks and other issues that can occur with traditional methods.
Second, upset tubing with casing pipe is more cost-effective than traditional methods. The process requires fewer Materials and labor, which can help to reduce costs. Additionally, the process is faster than traditional methods, which can help to reduce downtime and improve efficiency.
Calculated mass c | |||||||||||
Nominal linear Mass T& C b,c | Wall Thick- ness | em, Mass Gain or Loss Due to End Finishing d | |||||||||
Labels a | Outside diameter | inside Diameter | Drift Diameter | Plain- end | kg | ||||||
round Thread | Buttress Thread | ||||||||||
wpe | |||||||||||
D | kg/m | t | D | mm | kg/m | Short | Long | RC | SCC | ||
mm | mm | mm | |||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
10 3/4 | 32.75 | 273.05 | 48.74 | 7.09 | 258.9 | 254.91 | 46.5 | 13.94 | — | — 15.38 | — 3.03 |
10 3/4 | 40.5 | 273.05 | 60.27 | 8.89 | 255.3 | 251.31 | 57.91 | 11.91 | — | 14.21 | 1.86 |
10 3/4 | 45.5 | 273.05 | 67.71 | 10.16 | 252.7 | 250.82 e 248.77 246.23 246.33 | 65.87 | 11 | — | 14.21 | 1.86 |
10 3/4 | 45.5 | 273.05 | 67.71 | 10.16 | 252.7 | 244.48 e | 65.87 | 11 | — | 13.05 | 0.7 |
10 3/4 | 51 | 273.05 | 75.9 | 11.43 | 250.2 | 244.48 e 243.94 243.94 241.40 241.40 238.86 238.86 234.95 231.80 228.60 | 73.75 | 10.11 | — | 13.05 | 0.7 |
10 3/4 | 51 | 273.05 | 75.9 | 11.43 | 250.2 | 73.75 | 10.16 f | — | 12.25 | –0.09 | |
10 3/4 | 55.5 | 273.05 | 82.59 | 12.57 | 247.9 | 80.75 | 9.3 | — | 12.01 | –0.34 | |
10 3/4 | 55.5 | 273.05 | 82.59 | 12.57 | 247.9 | 80.75 | 9.35 f | — | 12.25 | –0.09 | |
10 3/4 | 55.5 | 273.05 | 82.59 | 12.57 | 247.9 | 80.75 | 9.3 | — | 12.01 | –0.34 | |
10 3/4 | 55.5 | 273.05 | 82.59 | 12.57 | 247.9 | 80.75 | 9.35 f | — | 11.07 | — | |
10 3/4 | 60.7 | 273.05 | 90.33 | 13.84 | 245.4 | 88.47 | 8.42 | — | 10.87 | — | |
10 3/4 | 60.7 | 273.05 | 90.33 | 13.84 | 245.4 | 88.47 | 8.47 f | — | 9.98 | — | |
10 3/4 | 65.7 | 273.05 | 97.77 | 15.11 | 242.8 | 96.12 | 7.54 | — | 9.74 | — | |
10 3/4 | 65.7 | 273.05 | 97.77 | 15.11 | 242.8 | 96.12 | 7.60 f | — | — | — | |
10 3/4 | 73.2 | 273.05 | 108.93 | 17.07 | 238.9 | 107.76 | — | — | — | — | |
10 3/4 | 79.2 | 273.05 | 117.86 | 18.64 | 235.8 | 116.95 | — | — | — | — | |
10 3/4 | 85.3 | 273.05 | 126.94 | 20.24 | 232.6 | 126.19 | — | — | |||
11 3/4 | 42 | 298.45 | 62.5 | 8.46 | 281.5 | 279.40 e 277.50 275.44 272.39 | 62.56 | 13.27 | — | — | — |
11 3/4 | 42 | 298.45 | 62.5 | 8.46 | 281.5 | 269.88 e | 62.56 | 13.27 | — | — 16.04 | — |
11 3/4 | 47 | 298.45 | 69.94 | 9.52 | 279.41 | 269.88 e | 67.83 | 12.42 | — | 14.5 | — |
11 3/4 | 54 | 298.45 | 80.36 | 11.05 | 276.4 | 269.65 | 78.32 | 11.23 | — | 13.12 | — |
11 3/4 | 60 | 298.45 | 89.29 | 12.42 | 273.6 | 269.65 e | 87.61 | 10.17 | — | 13.12 | — |
11 3/4 | 60 | 298.45 | 89.29 | 12.42 | 273.6 | 269.88 e 267.36 264.92 | 87.61 | 9.77 f | — | 13.12 | — |
11 3/4 | 60 | 298.45 | 89.29 | 12.42 | 273.6 | 87.61 | 10.17 | — | 13.12 | — | |
11 3/4 | 60 | 298.45 | 89.29 | 12.42 | 273.6 | 87.61 | 9.77 f | — | — | — | |
11 3/4 | 65 | 298.45 | 96.73 | 13.56 | 271.3 | 95.27 | — | — | — | — | |
11 3/4 | 65 | 298.45 | 96.73 | 13.56 | 271.3 | 95.27 | — | — | — | — | |
11 3/4 | 71 | 298.45 | 105.66 | 14.78 | 268.9 | 103.4 | — | — | — |
Third, upset tubing with casing pipe is safer than traditional methods. The process eliminates the need for welding, which can be dangerous. Additionally, the process eliminates the need for hot work, which can be hazardous. This helps to reduce the risk of accidents and injuries.
casing pipe china good Factory,Oil Tube wholesale–Price high-quality good chinese,casing pipe Chinese high-quality factory,Finally, upset tubing with casing pipe is more environmentally friendly than traditional methods. The process eliminates the need for welding, which can produce hazardous fumes. Additionally, the process eliminates the need for hot work, which can produce hazardous smoke. This helps to reduce the environmental impact of oil and gas operations.
API 5ct l80 casing tubingdimensions and Masses for standard Casing and for Casing Threaded with | |||||||||||
API Round Thread and Buttress Thread | |||||||||||
Labels a | Calculated Mass c | ||||||||||
Nominal Linear Mass T& C b,c | Wall Thick- ness | em, Mass Gain or Loss Due to End Finishing d | |||||||||
Outside Diameter | Inside Diameter | Drift Diameter | Plain- end | kg | |||||||
Round Thread | Buttress Thread | ||||||||||
wpe | |||||||||||
D | kg/m | t | D | mm | kg/m | Short | Long | RC | SCC | ||
mm | mm | mm | |||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
4 1/2 | 9.5 | 114.3 | 14.38 | 5.21 | 103.88 | 100.7 | 14.02 | 3.64 | — | — 4.53 | — 1.12 |
4 1/2 | 10.5 | 114.3 | 15.73 | 5.69 | 102.92 | 99.74 | 15.24 | 3.33 | — 3.61 | 4.32 | 0.91 |
4 1/2 | 11.6 | 114.3 | 17.38 | 6.35 | 101.6 | 98.42 | 16.91 | 3.18 | 3.35 | 4.07 | 0.6 |
4 1/2 | 13.5 | 114.3 | 19.87 | 7.37 | 99.56 | 96.38 | 19.44 | — | 3.53 | 3.64 | 0.24 |
4 1/2 | 15.1 | 114.3 | 22.69 | 8.56 | 97.18 | 94 | 22.32 | — | |||
5 | 11.5 | 127 | 17.19 | 5.59 | 115.82 | 112.64 | 16.74 | 4.32 | — 4.85 | — 5.38 | — 1.24 |
5 | 13 | 127 | 19.69 | 6.43 | 114.14 | 110.96 | 19.12 | 4 | 4.51 | 4.99 | 0.61 |
5 | 15 | 127 | 22.69 | 7.52 | 111.96 | 108.78 | 22.16 | 3.71 | 4.52 | 4.4 | 0.22 |
5 | 18 | 127 | 27.19 | 9.19 | 108.62 | 105.44 | 26.7 | — | 3.45 | 3.76 | –0.62 |
5 | 21.4 | 127 | 32.13 | 11.1 | 104.8 | 101.62 | 31.73 | — | 3.15 | 3.42 | –0.96 |
5 | 23.2 | 127 | 34.76 | 12.14 | 102.72 | 99.54 | 34.39 | — | 2.99 | 3.23 | –1.14 |
5 | 24.1 | 127 | 36.15 | 12.7 | 101.6 | 98.42 | 35.8 | — | |||
5 1/2 | 14 | 139.7 | 20.91 | 6.2 | 127.3 | 124.12 | 20.41 | 4.6 | — 5.26 | — 5.71 | — 0.87 |
5 1/2 | 15.5 | 139.7 | 23.48 | 6.98 | 125.74 | 122.56 | 22.85 | 4.36 | 5.31 | 5.41 | 0.58 |
5 1/2 | 17 | 139.7 | 25.72 | 7.72 | 124.26 | 121.08 | 25.13 | 4.14 | 4.5 | 4.84 | 0.45 |
5 1/2 | 20 | 139.7 | 30.05 | 9.17 | 121.36 | 118.18 | 29.52 | — | 4.37 | 4.31 | -0.52 |
5 1/2 | 23 | 139.7 | 34.05 | 10.54 | 118.62 | 115.44 | 33.57 | — | — | — | — |
5 1/2 | 26.8 | 139.7 | 40.15 | 12.7 | 114.3 | 111.12 | 39.78 | — | — | — | — |
5 1/2 | 29.7 | 139.7 | 44.47 | 14.27 | 111.16 | 107.98 | 44.14 | — | — | — | — |
5 1/2 | 32.6 | 139.7 | 48.74 | 15.88 | 107.94 | 104.76 | 48.49 | — | — | — | — |
5 1/2 | 35.3 | 139.7 | 52.8 | 17.45 | 104.8 | 101.62 | 52.61 | — | — | — | — |
5 1/2 | 38 | 139.7 | 56.82 | 19.05 | 101.6 | 98.42 | 56.68 | — | — | — | — |
5 1/2 | 40.5 | 139.7 | 60.64 | 20.62 | 98.46 | 95.28 | 60.55 | — | — | — | — |
5 1/2 | 43.1 | 139.7 | 64.41 | 22.22 | 95.26 | 92.08 | 64.38 | — | |||
6 5/8 | 20 | 168.28 | 29.76 | 7.32 | 153.64 | 150.46 | 29.06 | 5.58 | 6.23 | 6.35 | 0.89 |
6 5/8 | 24 | 168.28 | 35.72 | 8.94 | 150.4 | 147.22 | 35.13 | 4.42 | 5.48 | 5.52 | 0.68 |
6 5/8 | 28 | 168.28 | 41.67 | 10.59 | 147.1 | 143.92 | 41.18 | — | 4.73 | 4.71 | –0.75 |
6 5/8 | 32 | 168.28 | 47.62 | 12.06 | 144.16 | 140.98 | 46.46 | — | 4.73 | 4 | –1.46 |
Overall, upset tubing with casing pipe is a cost-effective and efficient way to improve oil and gas operations. This method of pipe installation offers a number of benefits that can help to reduce costs and improve safety. By utilizing this method, oil and gas operations can become more efficient and cost-effective while also reducing their environmental impact.